Van Buren
Description: 5.35 miles of hot mix asphalt resurfacing, trenching, widening and slope restoration on CR 687 from CR 352 to I-94 in Van Buren County
Job Time Frame: 5/10/18 – 7/12/18
Awards: NAPA Quality in Construction Award
This project consisted of trench widening the existing roadway, cold milling and paving the new widened roadway, guardrail replacement and slope restoration.
Projects Under 50,000 Tons
Quality in Construction Award: CR 687 from CR 352 tp I-94 in Van Buren County
Contractor: Rieth-Riley Construction