80/90 Push Project- Indiana Toll Road

Rieth- Riley completed a 73 mile reconstruction of the Indiana Toll Road stretching all the way from Lake Station to Elkhart. The existing asphalt was removed and the roads were then treated with a concrete base. Rieth-Riley then paved the roads with 5 inches of new asphalt. The shoulders were both milled and repaved, bridges were rehabilitated and some were widened. Rieth-Riley also installed fiber optic cable which enables administrators to monitor road conditions and communicate them with drivers on the Toll Road.

73 Mile Reconstruction

A Mega Project of Historical Significance to Indiana awarded by APAI.

Contractor: Rieth-Riley Construction Co., Inc.

Owner: Indiana Highway Commission

Related Projects

Indiana Dunes

This job consisted of overlaying 144,000 square yard of 3/4″ overlay with a 4.75 MM mix along with crack filling, re-striping, and concrete wheel stops.