INDOT Contract Number: R-37562-A
Intersection Improvement, Roundabout and Bridge Replacement
Five Points Road and Edgewood Avenue
Road Closure – 92 Days
Rieth-Riley Construction Co., Inc. completed an intersection improvement project that included the replacement of the existing bridge on Edgewood Avenue and replacing it with a realigned three-sided box culvert. The intersection was further improved by constructing a roundabout at the intersection. In addition, Rieth-Riley performed site excavation, grading, storm sewer installation, sanitary sewer relocation, concrete sidewalk, concrete curbs, concrete pavement, colored concrete pavement and asphalt paving. Rieth-Riley finished on time and on budget. The project was an INDOT contract that served the city of Indianapolis, Indiana.
Asphalt Tons – 2,600 Tons
Concrete Curbs – 5,000 LFT
Storm Sewer – 1,450 LFT
Three-sided Box Culvert – 181 LFT