80/90 Push Project- Indiana Toll Road
Rieth- Riley completed a 73 mile reconstruction of the Indiana Toll Road stretching all the way from Lake Station to Elkhart. The existing asphalt was removed and the roads were then treated with a concrete base. Rieth-Riley then paved the roads with 5 inches of new asphalt. The shoulders were both milled and repaved, bridges were rehabilitated and some were widened. Rieth-Riley also installed fiber optic cable which enables administrators to monitor road conditions and communicate them with drivers on the Toll Road.
73 Mile Reconstruction
A Mega Project of Historical Significance to Indiana awarded by APAI.
Contractor: Rieth-Riley Construction Co., Inc.
Owner: Indiana Highway Commission